Meeting spec (doing the minimum)
Two ways of saying the same thing. If the bridge needs to hold 20,000 pound vehicles, the client isn’t interested in paying extra for you to build it to hold 30,000 pound vehicles. The spec is clear–15,000 is unacceptable, and 30,000 isn’t worth a penny extra in steel, concrete or pilings. But when we’re bringing […]